Page 30 - Black Bay Vision Plan
P. 30
WHAT WE HEARD - DESIGN PLAN ALTERNATIVES (BLACK BAY VISIT JAN 22, 2019)
STAKE HOLDER MEETING:
1. Phasing plan needed to reach alt 3 2
2. Discussion of bridge entry
11
[Well received, expensive]
3. Needs to feel unique to the area, materiality and form
4. Deck system consider: seasonal water levels, rails
[pier or floating system, could use test case for ero-
sion control for city]
COMMUNITY MEETING #2:
5. Tree health
6. Pine bluff keep passive programming
7. Look into water level change, rock outcropping locations 5
8. Dock depth?
9. Would the dock be for profit and would it be policed?
10. Avoid use of foreign material and styles 12
11. Alt 3 was a crowd favorite: In favor of parking lot location
and boardwalk
3 10
PARKS AND REC COMMISSION: 6
12. In favor of:
a. Touching the land lightly
b. Keep a park in motion
c. Moving the parking lot
13. Want to make sure alt 3 includes room for a swimming
area
13
9 4
7 8
1
VISION PLAN 30