Page 62 - Black Bay Vision Plan
P. 62
STREETSCAPE - 3RD STREET
EXISTING 3RD STREET SECTION PROPOSED 3RD STREET SECTION
3rd Street streetscape includes a continuous sidewalk
connection to the park along with stormwater planters to
capture and treat all roadway surface runoff. The proposed
streetscape includes a dedicated bike lane on the east-
side of the street that connects directly to a park path. By
including stormwater features with this streetscape design it
provides the opportunity to collect storm runoff, cut down
on flooding, enhance aesthetics with increased vegetation,
improve pedestrian safety, increase habitat and biodiversity,
and provide for an overall healthier community.
A. EXISTING 3RD STREET PLAN (looking East)
KEY MAP
LEGEND
SIDEWALK
EXISTING BIKE LANE
ST PARKING
STORMWATER PLANTING AREA B. EXISTING 3RD STREET PLAN W/BIKE LANE (looking East) C. PROPOSED 3RD STREET PLAN (looking East)
B.
A. & C.
PROPOSED 3RD STREET PLAN
VISION PLAN 62